Basement Finish Permits

Print
Press Enter to show all options, press Tab go to next option

Many people chose to finish their lower level to increase their living  space. Construction permits are required. 

A homeowner may perform the construction work on their own property where they reside without a contractor’s license. Additional permits are required for any mechanical, electrical or plumbing work to be completed. If the home is owner-occupied and a single family dwelling, the homeowner may be issued the mechanical, electrical and plumbing permits as well. If the home is duplex or multi-family dwelling, subcontractors will need to be hired for these trades.

finished basement

For more information:

Basement Finish Brochure

2015 International Residential Code

2017 National Electric Code

2015 International Mechanical Code

2015 International Plumbing Code

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer