Developer/Contractor Information

Print
Press Enter to show all options, press Tab go to next option

CONSTRUCTION PROJECTS OUT FOR BID

None at this time.

INFORMATION FOR DEVELOPERS AND CONTRACTORS

The Marion Municipal Water Works are governed by the Rules and Regulations Governing the Municipal Water Works in the City of Marion. 

Please use the Marion Water Department Water Main Application Form  for all new water main installations in Marion.  Please have this filled out along with the Department of Natural Resources (DNR) water schedule forms when the plan of improvements plan sets are initially submitted for department review and comments. There is a $50 charge for plan review per application.

Our Schedule of Fixed Charges covers current fees for meters, service calls and various other charges.  Some of the most common fees are:

   $150 per tap plus materials on all new water mains.  Water department installs taps up to 2" in diameter. 

   $225 + tax for new 3/4" water meter for all new homes and businesses (price depends on meter size) 

   $0.75 per linear foot for new water main installation or $500 minimum charge which covers inspection and 

   testing costs 

DESIGN STANDARDS

Metro Design Standards for Water Main

Metro Standards and Specifications

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer